Gas thermal power station - Port of Lomé
Sofelex participates in the electrical supply and the logistical monitoring of the new gas thermal power station at the port of Lomé, 65 megawatts.
Togo will only reach 50% of electrification by the end of 2020 and this project will make it possible to support 30% of domestic demand.